Survey
On Survey tab represented the table of measuring and mapping the trajectory and location of a borehole.
For the survey provided list of parameters:
-
Survey - number of survey;
-
Strart - date and time when mesurment started ;
-
MD - measured depth;
-
Inc, deg - deviation from vertical, irrespective of compass direction;
-
Azi, deg - compass direction of a survey as planned or measured by a directional survey;
-
c.Inc, deg - corrected inclination;
-
c.Azi, deg - corrected azimuth;
-
TVD, m (true vertical depth) - vertical distance from a surface reference point to a point in a wellbore, calculated perpendicular to the surface;
-
ΔTVD - the change in true vertical depth between two points in a wellbore;
-
TVDSS - true vertical depth measured to a sea-level data;
-
NS, m - north-south direction depth;
-
ΔNS, m
-
EW, m - east-west direction depth
-
ΔEW, m
-
Northing. m - the distance to the North or the South;
-
Easting, m - the distance in meters from a central meridian line;
-
Latitude - coordinate used to specify the north-south position of a location;
-
Longitude - a coordinate used to specify the east-west location on the surface of the Earth;
-
VSec, m - vertical sectioning: horizontal displacement projected onto the reference azimuth;
-
HOff, m -– Horizontal Offset; plan-view distance from surface location to the wellbore;
-
THL - True Horizontal Length; cumulative horizontal displacement along the wellbore;
-
DLS (dogleg severity) - the rate of change in a borehole's direction (inclination and azimuth);
-
CL (caliper log) – Connection Length; length drilled per pipe connection;
-
TF, deg – Measured toolface angle from the downhole tool;
-
BR. deg – Build Rate; change in inclination between surveys;
-
TR, deg – Turn Rate; change in azimuth between surveys;
-
HD, m – Horizontal Distance; incremental horizontal displacement;
-
VD, m – Vertical Distance; incremental vertical displacement;
-
DIST, m - minimum distance from survey to the planned well path;
-
DIRECT. deg – Direction from survey point to closest point on the well plan;
-
cl.AZI, deg - Calculated azimuth at the closest point on the well plan;
-
G – Gravity field magnitude used for survey calculations;
-
B – Uncorrected magnetic field magnitude used for survey calculations;
-
Dip – Magnetic dip angle; inclination of the Earth’s magnetic field;
-
c.B – Corrected magnetic field magnitude (short-collar correction applied);
-
c.Dip – Corrected magnetic dip angle (short-collar correction applied);
-
ngZone – No-Go Zone status as defined in system settings;
-
Well ID;
-
Section ID;
-
Run name;
-
-
Comment
Visibility of the columns can be set up in the column labels drop-down list. To hide the column, untick the checkbox next to it. Precision of the numeric values can be changed in the Column labels dropdown.
If the inclination and azimuth values corresponds to values, defined in Tolerance c.Inc and c.Azi cells are colored in green.
When the values are counted wrongly, the entire row of the survey is colored in red.
The table can be filtered by selecting the filter in the drop-down list above the table.
Slidesheet
This track tool shows a list of the slides that have been performed during the well. The slide sheet provides an interesting package of columns to give the user as much information as possible.
Slide sheet table contains following data:
Date - the date of the record
Comment - additional data on the record
Operation - operation type
Start time - time when the operation started
Stop time - time when the operation got stopped
Joint # - the number of the joint
MD From - Measured Depth where record starts
MD To - Measured Depth where record stops
Calc ROP - calculated rate of penetration
TF Model - Toolface reference: MTF for vertical/sub-vertical wells; GTF for inclination >3°
TF Angle - Toolface orientation relative to the selected reference
Flow - rate of fluid flow
SPP On -Standpipe pressure with bit on bottom
SPP Off -standpipe pressure with bit off bottom
WOB - downward force applied to a drill bit by the drill string to crush or shear rock
RPM - rotations per minute
Torque - how much a force acting on an object causes that object to rotate
Off Bot Torque - drillstring torque with bit off bottom
Slack Off - hookload while slacking off (running in hole)
Rotating - hookload while rotating
PU Weight - pumping unit weight
Lith. -Lithology
Survey - completed measurement of the inclination and azimuth of a location in a well
Survey MD - measured depth of survey station (bit depth minus bit lead
Inc - deviation from vertical, irrespective of compass direction
Azi - compass direction of a survey as planned or measured by a directional survey
DLS - dog-leg severity (°/30 m or °/100 ft)
Data in the table can be edited by Directional driller manually in the Cybersteer application.
To load header with average values click on AVG button. Additional rows will be added with Minimum, Average and Maximum.
Additional table with summary can be added by clicking on SUM button. If the SUM option is on the table with summary will be included to the pdf repo
Well Plan
Well Plan section is a page where the Directional Drilling Plan must be uploaded; it will serve as support for the charts and many KPI widgets.
Section Info
Section info allow to view and download basic section information, such as Well location, Well Information, Section Info and section geomagnetics.
To download the data, click on the download button
Charts
This section shows a 2D chart comparison between Well Plan and the current well design based on directional surveys. On the right-side panel, the Wells sections can be selected/deselected to be plotted on the chart. Each section will have its own color.
Charts 3D
Cyberloop provides this amazing chart where the user can compare the current well design based on directional parameters with the Well Plan which should be uploaded.